Inspection standard for shelf installation
Date:2016-12-05 Browse:5144
1 device shelves should be strictly in accordance with the drawings to operate, the error down to at least, in order to prevent unnecessary mistakes, the site if there is an impact on the construction of safety factors
Put forward on the spot, waiting to be able to continue to test the device, the customer should actively cooperate with our operations.
2 the measurement and inspection tools, instruments, and appearance, which are used in the device of our company, are in conjunction with the current regulations of the state, and its accuracy level is not lower than the accuracy level of the request of the device. My company's equipment personnel selection of precision instruments to the greatest degree of fault and fault.
3 the concealed works before the shelf installation should be checked before the project is concealed.
4 Shelf in the process of the device, it is necessary to staff through professional training posts, in the process of equipment personnel to check each other, self inspection, to prevent the show less installed, missing parts to the future security risks. Shelf device
Shelf device specification
2) Foshan shelf device, to deal with the surrounding power supply, fire, fire, and so on. Did not reach the fire specifications should be rectification before construction.
3) Foshan shelf device before construction, the site of the ground floor, the site should have been completed, near the waste debris to be promptly cleaned.
1, the shelf factory equipment in the device after the completion of the device to do some level, straight corresponding debugging measurement, to ensure the normal use of the shelf
2, large load capacity of heavy shelves and other types of storage shelves should be on the shelves of the beam column and other parts of the bearing capacity test is necessary to get up to the request can be used
3, there is a stack of the Foshan shelf should be checked. Shelf matters
5, all the fasteners are necessary to tighten the processing bolts should be exposed nut 2-4 screw pitch; after the head screw fastening, the sink head should be buried into the component, not allowed to expose.
Shelf code
3, the use of plate adjustable normally, shall conform to the following rules:
1) each plate group try to cut the number of pad plate principle, the maximum constraint beyond 5. When placed in the thick thin adopted principle placed under the plate group
2) each plate group should be placed in regular touch smooth, outstanding.
3) after test, each plate should be pressed. Shelf no shaking phenomenon. Shelf device rules